Work Progress: 2010-10-12 [DAY 003], Soil Test: Land Clearing & Drainage (cont).

12-10-2010 [DAY 003]

Before suitable access can be made available to soil engineers, suitable paths have to be prepared to allow access by heavy machinery leading to strategic pre-determined locations for soil testing.

Some areas on site are still water-logged due to poor drainage. Therefore trenches are dug to drain away excess water in order to allow easier access by heavy machinery for the transporation of soil test machines and jungle clearing. 